top of page

Muswellbrook TAFE

This project involved the installation of a Building Management System (BMS) at Muswellbrook TAFE via a DEOS Direct Digital Control (DDC). It manages a Daikin VRV air conditioning system, electrical systems and hydraulic systems.

 

Mechanical Services

Daikin VRV Air Conditioning, two Toilet Exhaust fans.

 

Electrical systems

Fire Lighting Control points, General Fire Trip.

Security, Lift, Power factor correction, UPS, Generator, Electrical meter.

 

Hydraulic systems

Hot water circulating pump, water tank, Stormwater pump, Recycled water pump.

 

Access to the BMS graphic management system is via the dedicated PC, and in addition, the DEOS system can be accessed over the Campus LAN from any PC with appropriate permissions, software and networking.

 

Remote Access connectivity is also available for Client and Automation Industries. Remote access by Automation Industries is secure using encrypted VPN connection to our central monitoring OPENweb server.

About

TAFE NSW has a strong presence in Muswellbrook, located at 59 Maitland Street as well as the new Tertiary Education Centre on Hill Street in Muswellbrook's CBD.

 

Muswellbrook TAFE offers courses in accordance with TAFE NSW, Australia's leading provider of vocational education and training. 

Challenges

With the new building/expansion of facilities at Muswellbrook TAFE, the opportunity to implement a sophisticated yet easy to manage BMS was carefully considered and implemented. The benefits to TAFE are advanced control and security, fault reporting, power and services monitoring.

How We Helped

Automation Industries was able to work with Atack Airconditioning Muswellbrook TAFE to implement the BMS they needed.

 

An important aspect was the ease of use of the DEOS graphic interface and the ability to login from any PC on the LAN.

Find Out If We Can Help Make Your Project A Success

bottom of page